• Accessibility
  • Low-bandwidth version
  • A A A
  • Home
  • About QMM
  • Project overview
  • Media
  • Library
  • Sustainable development
  • Contacts
  • Links
  • Library
  • Publications
  • Photo library
  • Community relations
  • Health and safety
  • General
  • Mine and port
  • Biodiversity
  • Technical
  • Film clips and radio
  • Map
  • Technical diagrams
  • Print this page
Home Library Photo library Technical

Technical

To download an image, Windows users should right-click and choose Save option. Mac OS users should control click and choose the Save option. All images are copyright Rio Tinto.

Rehabilitation of national road RN13 (opens as a pop-up)

Rehabilitation of national road RN13

Quarry access road (opens as a pop-up)

Quarry access road

Temporary camp for workers (opens as a pop-up)

Temporary camp for workers

Fort-Dauphin Port following refurbishment (opens as a pop-up)

Fort-Dauphin Port following refurbishment

Mobilisation works with fully functional quarry in Andriambe, 5km from the new port (opens as a pop-up)

Mobilisation works with fully functional quarry in Andriambe, 5km from the new port

Construction of the quarry-to-port haul road (opens as a pop-up)

Construction of the quarry-to-port haul road

Dune stabilisation along the dune crossing section of the quarry-to-port haul road (opens as a pop-up)

Dune stabilisation along the dune crossing section of the quarry-to-port haul road

Initial work at the mineral separation plant site (opens as a pop-up)

Initial work at the mineral separation plant site



Help | Privacy policy | Site terms and conditions | Contact us | Legal | Site map

© 2007 Rio Tinto — All rights reserved.

Investis Logo