The mine's path over the first 25 years of the operation

The mine path is expected to begin close to the mineral separation plant, roughly at the centre of the Mandena deposit. This is where the dredge and the floating concentrator will be assembled.

Diagram of the mine's path

See also
The deposits
Extraction and separation methods
Dredge and floating concentrator
Mineral separation plant
Process sequence
Mine-to-port haul road
The port
Project status
Photographs of the construction phase